Instruction Manual
D101634X012
HP and HPA Valves
October 2014
5
Table 4. Additional Shutoff Classification per ANSI/FCI 70-2 and IEC 60534-4
Valve Design
Valve Size, NPS Port Diameter
Cage Style Leakage Class
HPD HPAD mm Inches
HPD, HPAD
with optional
C-seal trim
3 4 73.0 2.875
Equal Percentage, Modified Equal Percentage,
Linear (std. cage),
Linear (Whisper III, A1, B1)
V
4 6 73.0 2.875 Linear (Whisper III, D3) V
4 6 92.1 3.625
Equal Percentage, Modified Equal Percentage,
Linear (std. cage),
Linear (Whisper III, A1, B3, C3)
V
6 8 111.1 4.375 Linear (Whisper III, D3) V
6 8 136.5 5.375
Equal Percentage, Modified Equal Percentage,
Linear (std. cage),
Linear (Whisper III, A1, B3, C3)
V
Table 5. TSO (Tight Shutoff) Leakage Class per ANSI/FCI 70-2 and IEC 60534-4
Leakage Class Maximum Leakage Test Medium Test Pressure Leakage Class
TSO (Tight Shutoff)
Valves with TSO trim are factory
tested to a more stringent Emerson
Process Management test
requirement of no leakage at time of
shipment.
Water Service P
(1)
V
1. Specify service Pwhenordering.
Table 6. TSO Shutoff Availability
VALVE DESIGN CONSTRUCTION LEAKAGE CLASS
HPS, HPT Std or Cavitrol III trim. Replaceable, protected soft seat TSO - Standard
Table 7. Recommended Torque for Packing Flange Nuts (Non Live-loaded Graphite Packing)
STEM
DIAMETER
VALVE BODY
RATING(1)
TORQUE
NSm lbfSft
mm Inches Min Max Min Max
12.7 1/2 CL900 12 18 9 13
12.7 1/2 CL1500 15 22 11 16
12.7 1/2 CL2500 18 24 13 18
19.1 3/4 CL900 27 41 20 30
19.1 3/4 CL1500 34 50 25 37
19.1 3/4 CL2500 41 61 30 45
25.4 1 CL900 42 62 31 46
25.4 1 CL1500 52 77 38 57
25.4 1 CL2500 61 91 45 67
31.8 1-1/4 CL900 56 83 41 61
31.8 1-1/4 CL1500 68 102 50 75
1. For intermediate class ratings, use the same torque as the next lower standard class.
CAUTION
Depending on valve body materials used, post-weld heat treating might be needed. Post-weld heat treatment can damage
internal elastomeric, plastic, and metal parts. Shrink-fit pieces and threaded connections might also loosen. In general, if
post-weld heat treating is needed, remove all trim parts. Contact your Emerson Process Management sales office for
additional information.
Vista de página 4
1 2 3 4 5 6 7 8 9 10 ... 55 56

Comentários a estes Manuais

Sem comentários